2007 Expansion
Built 30 new tent sites.
Installed 42 new RV sites.
Installed sanitary sewer, water, and electric services to new RV sites.
Began construction of open air pavilion, completion in 2008.
Installation of new well and upgrade of existing well.
Placed new gravel on all roads.
Installed new horse-shoe pits.
Placed new gravel on baseball field.
Rebuilt wood docks.
Developed additional nature hiking trails.
2008 Expansion
Constructed sanitary sewer treatment facility for new sewer system.
Built one new duplex cabin.
Built well house for new well.
Completed construction of open air pavilion.
Upgraded beach and swimming area.
Added 32 new boat slips.
New mattresses for cabins.
2009 Expansion
Built several Duplex Cabins with the help of the Minnesota National Guard.
Landscaped around new pavillion area.
Remodeled and updated existing cabins.
Opened new wastewater dump station.
Prepared the camp to have limited winter camping, beginning January 1, 2010.
Remodeled the canteen game room.
New volleyball court
|